Pendragon at Rudyard 01im.jpg |
Raising steam 02im.jpg |
E.R.Calthrop and Merlin leave Rudyard 03im.jpg |
E.R.Calthrop and Merlin leave Rudyard 04im.jpg |
Waverly waiting for departure 05im.jpg |
King Arthur approahes the level crossing 06im.jpg |
The GNR Ivatt being prepared. Soon after a regulator problem was discovered and it wasn't used until late in the afternoon 08im.jpg |
Trains preparing to depart from Hunthouse wood 10im.jpg |
E.R.Calthrop at Hunthouse wood, it always ran doubleheaded I presume for braking purposes. 11im.jpg |
Merlin at Hunthouse wood 12im.jpg |
Pendragon 13im.jpg |
King Arthur 14im.jpg |
Excalibur 15im.jpg |
E.R.Cathrop and Excalibur at The Dam 16im.jpg |
E.R.Cathrop and Excalibur at The Dam 17im.jpg |
Merlin 18im.jpg |
Merlin 19im.jpg |
Waverly 20im.jpg |
Waverley 21im.jpg |
Hunthouse Wood 22im.jpg |
Excalibur 23im.jpg |
Trains passing 24im.jpg |
King Arthur 25im.jpg |
E.R.Calthrop and King Arthur 26im.jpg |
E.R.Calthrop and King Arthur 27im.jpg |
Waverley and Merlin 28im.jpg |
Merlin 29im.jpg |
Waverley, the Atlantic and Merlin 30im.jpg |
The GNR Atlantic 31im.jpg |
The GNR Atlantic 32im.jpg |
Waverley 33im.jpg |
Pandragon and Merlin 34im.jpg |
The GNR Atlantic and Waverley 35im.jpg |
Merlin 36im.jpg |
Merlin 37im.jpg |
Pendragon 38im.jpg |
| | | |